| In-slab heating involves the installation of an element to the concrete reinforcement  mesh prior to the cement pour. This is usually done as close to the day of  pouring as possible. Cables are pre-tested before leaving the factory - rested  prior to the concrete pour and then tested again before connection to the  electrical supply.                                   Once the cement has been poured the new slab must be left for weeks before the  system is switched on. The slab acts as a heat storage bank which warms up  during off-peak times - while heat dissipates from the slab throughout the day.                                   The system can also be set to come on for a pre-determined at-day rate as  heating requirements increase towards the end of the day. Stewart Ave Plumbing  and Heating offers a full design, quotation and installation service for  in-slab heating.  Installation includes the supply of heating elements,  thermostats and wiring for the system. |